Apollo and America's Moon Landing Program: Apollo 14 Official NASA Mission Reports and Press Kit - 1971 Third Lunar Landing - Astronauts Shepard, Roosa, and Mitchell

Nonfiction, Science & Nature, Science, Physics, Astronomy, History, Americas
Cover of the book Apollo and America's Moon Landing Program: Apollo 14 Official NASA Mission Reports and Press Kit - 1971 Third Lunar Landing - Astronauts Shepard, Roosa, and Mitchell by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781465964298
Publisher: Progressive Management Publication: November 28, 2011
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781465964298
Publisher: Progressive Management
Publication: November 28, 2011
Imprint: Smashwords Edition
Language: English

Three comprehensive official NASA documents - converted for accurate flowing-text e-book format reproduction - chronicle the successful flight of Apollo 14, which resumed the lunar landing program following the Apollo 13 accident.

Two technical mission reports, the Manned Spacecraft Center (MSC) Apollo Mission Report and the NASA Headquarters Mission Operation Report (MOR), provide complete details about every aspect of the mission.

Apollo 14 MSC Mission Report: Mission description, pilots' report, communications, trajectory, command and service module performance, mission support performance, assessment of mission objectives, launch vehicle summary, anomaly summary (CSM, LM, government furnished equipment), conclusions, vehicle descriptions. Apollo 14 MOR: Mission design and execution, spacecraft performance, flight anomalies, detailed objectives and experiments, launch countdown, detailed flight mission description, back contamination program, contingency operations, configuration differences, mission support, recovery support plan, flight crew, mission management responsibility, program management, abbreviations and acronyms. Apollo 14 Press Kit: Detailed preview from countdown to landing.

Apollo 14 launched on January 31, 1971. Difficulties were experienced in docking with the lunar module, or LM, and six attempts were required before a "hard dock" was achieved. On Feb. 5, Antares made the most precise landing to date, approximately 87 feet from the targeted landing point. The landing point coordinates were 3 degrees, 40 minutes, 27 seconds south and 17 degrees, 27 minutes, 58 seconds west, midway between the Doublet and Triplet craters in the hilly uplands of the Fra Mauro crater, and about 110 miles east of the Apollo 12 landing site. Due to communications system problems, the first period of extra vehicular activity, or EVA, began almost one hour later than scheduled with Commander Alan Shepard setting foot on the lunar surface at 114 hours, 31 minutes GET. The first of the two EVA periods included ALSEP deployment and lasted four hours, 49 minutes. The second EVA on Feb. 6 began when the LM egress hatch was opened at 4:15 a.m. EST. During this EVA, Shepard and Edgar Mitchell moved more than half a mile from their LM, conducting selenological investigations, collecting samples and attempting to reach the rim of Cone crater, approximately 300 feet above the landing site. NASA personnel monitoring the EVA estimate that the two astronauts were within 50 to 75 meters of the crater rim when they were advised by mission control to collect samples at that spot and begin their traverse back to the LM. The second EVA lasted four hours, 35 minutes, resulting in a new mark for EVA time by a lunar landing crew: nine hours, 24 minutes. Shepard set a new distance-traveled record on the lunar surface of approximately 9,000 feet.

The liftoff of Antares from the lunar surface took place precisely on schedule. Rendezvous and docking occurred only two minutes later than scheduled. The command module Kitty Hawk splashed down safely in the Pacific Ocean at 4:05 p.m. EST Feb. 9, exactly nine days and two minutes after launch. The actual landing point was only 1.02 nautical miles off its targeted point of about 765 nautical miles south of Samoa, and four miles from the prime recovery ship, the USS New Orleans. The mission duration from liftoff to splashdown was 216 hours, two minutes.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

Three comprehensive official NASA documents - converted for accurate flowing-text e-book format reproduction - chronicle the successful flight of Apollo 14, which resumed the lunar landing program following the Apollo 13 accident.

Two technical mission reports, the Manned Spacecraft Center (MSC) Apollo Mission Report and the NASA Headquarters Mission Operation Report (MOR), provide complete details about every aspect of the mission.

Apollo 14 MSC Mission Report: Mission description, pilots' report, communications, trajectory, command and service module performance, mission support performance, assessment of mission objectives, launch vehicle summary, anomaly summary (CSM, LM, government furnished equipment), conclusions, vehicle descriptions. Apollo 14 MOR: Mission design and execution, spacecraft performance, flight anomalies, detailed objectives and experiments, launch countdown, detailed flight mission description, back contamination program, contingency operations, configuration differences, mission support, recovery support plan, flight crew, mission management responsibility, program management, abbreviations and acronyms. Apollo 14 Press Kit: Detailed preview from countdown to landing.

Apollo 14 launched on January 31, 1971. Difficulties were experienced in docking with the lunar module, or LM, and six attempts were required before a "hard dock" was achieved. On Feb. 5, Antares made the most precise landing to date, approximately 87 feet from the targeted landing point. The landing point coordinates were 3 degrees, 40 minutes, 27 seconds south and 17 degrees, 27 minutes, 58 seconds west, midway between the Doublet and Triplet craters in the hilly uplands of the Fra Mauro crater, and about 110 miles east of the Apollo 12 landing site. Due to communications system problems, the first period of extra vehicular activity, or EVA, began almost one hour later than scheduled with Commander Alan Shepard setting foot on the lunar surface at 114 hours, 31 minutes GET. The first of the two EVA periods included ALSEP deployment and lasted four hours, 49 minutes. The second EVA on Feb. 6 began when the LM egress hatch was opened at 4:15 a.m. EST. During this EVA, Shepard and Edgar Mitchell moved more than half a mile from their LM, conducting selenological investigations, collecting samples and attempting to reach the rim of Cone crater, approximately 300 feet above the landing site. NASA personnel monitoring the EVA estimate that the two astronauts were within 50 to 75 meters of the crater rim when they were advised by mission control to collect samples at that spot and begin their traverse back to the LM. The second EVA lasted four hours, 35 minutes, resulting in a new mark for EVA time by a lunar landing crew: nine hours, 24 minutes. Shepard set a new distance-traveled record on the lunar surface of approximately 9,000 feet.

The liftoff of Antares from the lunar surface took place precisely on schedule. Rendezvous and docking occurred only two minutes later than scheduled. The command module Kitty Hawk splashed down safely in the Pacific Ocean at 4:05 p.m. EST Feb. 9, exactly nine days and two minutes after launch. The actual landing point was only 1.02 nautical miles off its targeted point of about 765 nautical miles south of Samoa, and four miles from the prime recovery ship, the USS New Orleans. The mission duration from liftoff to splashdown was 216 hours, two minutes.

More books from Progressive Management

Cover of the book World War II Japanese American Internment Reports: Japanese Americans in World War II: A National Historic Landmarks Theme Study - Historic Context, Relocation Centers, Detention Facilities by Progressive Management
Cover of the book The Smell of Kerosene: A Test Pilot's Odyssey - NASA Research Pilot Stories, XB-70 Tragic Collision, M2-F1 Lifting Body, YF-12 Blackbird, Apollo LLRV Lunar Landing Research Vehicle (NASA SP-4108) by Progressive Management
Cover of the book U.S. Naval Aviation in the Pacific: World War II - Pearl Harbor, Midway, Guadalcanal, Bougainville, Tarawa, Toyko, Tactical Effectiveness, Weapons by Progressive Management
Cover of the book Next-Generation Microbiological Requirements for Space Flight: Human Research Program, Space Human Factors & Habitability - Pathogens, Potable Water, Life Sciences, Manned Mars Missions by Progressive Management
Cover of the book Female Suicide Bombers: Terrorist Weapon of Choice, Review of Historical Bombers, Characteristics, Changes in Application by Terrorist Organizations, Hamas, Tamil Tigers, Chechen Rebels, Al Aqsa by Progressive Management
Cover of the book Space Shuttle NASA Mission Reports: 1997 Missions, STS-81, STS-82, STS-83, STS-84, STS-94, STS-85, STS-86, STS-87 by Progressive Management
Cover of the book Encyclopedia of NASA Lessons Learned (Part 2): Thousands of Aerospace Technology Engineering Reports, Problems, Accidents, Mishaps, Ideas and Solutions - Space Shuttle, Spacecraft, Rockets, Aircraft by Progressive Management
Cover of the book Histories of the Soviet / Russian Space Program: Volume 5: Soviet Space Programs: 1981-87 - Piloted Space Activities, Launch Vehicles, Launch Sites, and Tracking Support by Progressive Management
Cover of the book 21st Century U.S. Military Documents: The History of the Unified Command Plan 1946 - 1993 - Special Operations, Space, Atlantic Commands, Office of the Chairman of the Joint Chiefs of Staff by Progressive Management
Cover of the book 21st Century FEMA Study Course: Coordinating Environmental and Historic Preservation Compliance (IS-253) - Historic Property Laws, Preservation Issues, STATEX and CATEX by Progressive Management
Cover of the book Battle-Wise: Seeking Time-Information Superiority in Networked Warfare - Defeating Adversaries, Cognitive Demands, Integrating Intuition and Reasoning, Battle Wisdom from Firepower to Brainpower by Progressive Management
Cover of the book Military Chaplains as Peace Builders: Embracing Indigenous Religions in Stability Operations - Proposal for Expanded Role as Religious Liaisons for Local Cultural Relationships, Promotion of Goodwill by Progressive Management
Cover of the book United States Army Command and General Staff Officers Course Preparatory Curriculum Evaluation: Study of CGSOC Effectiveness Reveals Failure to Meet College Standards by Progressive Management
Cover of the book Factors Shaping Japan's Foreign Policy Toward the Senkaku Islands: Chinese Encroachments and Domestic Japanese Politics, Leaders Koizumi, Abe, Ishihara and Noda, Constitution and International Law by Progressive Management
Cover of the book Linking Legacies: Connecting the Cold War Nuclear Weapons Production Processes To Their Environmental Consequences - Nuclear and Radioactive Waste, Environmental Contamination by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy